Home > Products > Modified bitumen membrane > app waterproof membrane > APP modified bitumen waterproo.....
Browse Categories
Home improvement eco-friendly materials(12)
Self-adhesive waterproofing tape(109)
Modified bitumen membrane(116)
High polymer membrane(302)
Geotextile & Geomembrane(50)
Waterproof Raw Material(43)
Waterproof Production Lines(10)
Pu Painting,Coating,Primer and Emulsion(28)
Asphalt Saturated Felt(10)
Self-adhesive bitumen membrane(96)
Certifications
Contact us
China Address: Zhengyang Road, Shouguang City, Shandong Province, ChinaTel:+86 18366529777Fax:+86 05365511977 E-mail:admin@dongshengwaterproof.com
Contact Now
APP modified bitumen waterproof membraneAPP modified bitumen waterproof membraneAPP modified bitumen waterproof membrane

APP modified bitumen waterproof membrane

  • Min. order Quantity:2000 Square meters
  • Supply Ability :1500000 Square meters/month
  • Loading Port :QINGDAO PORT
  • Payment Term :L/C,T/T
  • Thickness :2mm,3mm,4mm,5mm
  • Width     :1m,1.05m
  • Length    :7.5m-10m
APP modified bitumen waterproof membrane, its base materials are polyester felt, or glass fiber, dipped and coated with APP, or APAO plastomer modified bitumen, both sides are covered with fine sand, mineral granular, PE film, aluminium foil.
 
Product Features: 
1) Good waterproof performance.
2) High tensile and tearing strength, elongation and size stability which accommodates substrate movement and deformation.
3) SBS Modified Bitumen Waterproof Membrane is better for building waterproof with low temperature.
4) Anti-puncture and rooting resistant, fatigue resistant, anti-corrosion, mildew resistant and weather resistant.
5) Easily operate with hot-melting method.
 
Application:
1) Roof and underground in industrial and civil buildings, wall, toilet.
2) Bridge, subway, tunnel, swimming pool, etc.
3) Waste landfill, sewage plant, irrigation system, etc.
Attention:
Make sure the roof deck smooth,clean,and dry (moisture<9%),then apply the surface of roof deck homogeneously with a kind bitumen paint,till dry to start application.
1) Heating and melting method
Heat the polyethylene film of the membrane and roof deck surface by heating and melting method to be nearly melted(not flowing),then install the membrane fully bonded to the roof deck with overlaps of 5-10cm.
2) Cold adhesive method
Pour the cold adhesive homogeneously on the roof deck, then roll the membrane to install it to be fully sealed to roof deck.
By heating and melting method and by cold adhesive can be used in alternation in application as requested. After application, a full serious inspection is required to sure no air bubble, no fold, no falling away. ect.
 
Storage and Transportation:
1) Separate storage for different models.
2) Temperature should be below 50 ℃.
3) Avoid direct sunshine, rain, keep ventilated.
4) Do not piled horizontally, keep stand and not more than 2 floors.




Weifang Dongsheng waterproof material Co.,Ltd

Tel:+8618366529777

Contact Person:daniel

Send your inquiry directly to us
show code on cursor in the input box
( 0 / 3000 )