Home > Products > Asphalt Saturated Felt > Cheap Asphalt paper supplier
Browse Categories
Home improvement eco-friendly materials(12)
Self-adhesive waterproofing tape(108)
Modified bitumen membrane(116)
High polymer membrane(302)
Geotextile & Geomembrane(49)
Waterproof Raw Material(43)
Waterproof Production Lines(10)
Pu Painting,Coating,Primer and Emulsion(28)
Asphalt Saturated Felt(10)
Self-adhesive bitumen membrane(95)
Certifications
Contact us
China Address: Zhengyang Road, Shouguang City, Shandong Province, ChinaTel:+86 18366529777Fax:+86 05365511977 E-mail:admin@dongshengwaterproof.com
Contact Now
Cheap Asphalt paper  supplierCheap Asphalt paper  supplierCheap Asphalt paper  supplier

Cheap Asphalt paper supplier

  • Min. Order Quantity: 40000 Square Meters
  • Supply  Ability    : 3000000 Square Meters /Month
  • Width              :100mm
  • Color              : grey/black
  • Loading port       :QINGDAO
  • Payment Term       :L/C,T/T

 

Asphalt Paper

 

 Description 

 

Basic level processing and requirements: before the bitumen paper applied, to check at the basic level.


 

 

 

 

 

 

 

  Where to use 

 

Ⅰ-Ⅱtype asphalt paper is in used in the simple waterprooftemporary building waterproof 

building damp proof and package etc. Ⅲ type asphalt paper can be used on the many

 layers waterproof on roof 、underground、water conservancy  and other project waterproof.


  Standard Data

 

Accord to the standard of GB326-2005

 

Spec .

Ⅰtype

Ⅱtype

Ⅲtype

The total quantity of coating per square

600

800

1000

Impervious

Pressure ≥

0.10Mpa

0.10Mpa

0.10MPa

The time can keep , min   ≥

30min

30min

30min

Water absorption ,% ≤

3.0

2.0

1.0

Heat resistance ,(85±2)℃

2 h the coated layer no sliding,flowing,Centralized air bubbles

Tensile ,the longitudinal N/50mm

240

280

340

Flexible ,(18±2)℃

No crack when bending

 

  Construction way 

 

The basic treatment :Before apply the waterproof membrane ,you need to check the basic layer (it had better is the level layer),it must offer to the requirement of application .

 

Before apply the asphalt paper, use the cool oil on dry and clean surface of basic level, waiting at least 12 hours then do the next process.


When the roof slope is less than 3%, asphalt paper should be parallel to the roof of the 

shop is stuck. When the roof slope is 3%-15%, asphalt paper can be parallel and vertical to the roof of the shop is stuck.Asphalt paper should be flattened, compaction, 

lap joint sealing side application of asphalt  Rubber seal materials carefully.Bonding of 

each layer of felt material of asphalt rubber thickness is 1-1.5 mm, no more than 2.0mm. 

When the shop is stuck, should roll coating while laid linoleum When all process finish,

 use protect layer as soon as possible.

 

 

Weifang Dongsheng waterproof material Co.,Ltd

Tel:86-15266615054

Contact Person:eva

Send your inquiry directly to us
show code on cursor in the input box
( 0 / 3000 )