Home > News > News > Construction safety management.....
Browse Categories
Home improvement eco-friendly materials(12)
Self-adhesive waterproofing tape(108)
Modified bitumen membrane(116)
High polymer membrane(302)
Geotextile & Geomembrane(49)
Waterproof Raw Material(43)
Waterproof Production Lines(10)
Pu Painting,Coating,Primer and Emulsion(28)
Asphalt Saturated Felt(10)
Self-adhesive bitumen membrane(95)
Certifications
Contact us
China Address: Zhengyang Road, Shouguang City, Shandong Province, ChinaTel:+86 18366529777Fax:+86 05365511977 E-mail:admin@dongshengwaterproof.com
Contact Now

News

Construction safety management in windy weather

  • Author:amber
  • Release on :2017-06-13


                             Construction safety management in windy weather

1, In case of more than six strong winds, shall not be open-air climbing and vacant high ground operations.
2, The wind construction template should be temporary anti-wind reinforcement measures.
3, When there are six or six windy weather should stop scaffolding erection and removal operations, to suspend the outdoor template removal and installation of high operations, to stop the open-air lifting operations, construction lifts must stop running, the ladder cage down to the bottom And cut off the power supply.
4, The case of 5 and above the wind, should stop all the template lifting operations.
5, In case of windy weather should stop the tower crane disassembly operations.
6, The wind in the four and above shall not carry out tower lifting movements. In the operation of the wind suddenly increased to four, you must immediately stop, and should be fastened, the next tower of the connecting bolts.
7, In case of six or more wind, it is strictly forbidden to install or remove tower crane anchorage device.
8, The operation of six or more winds or gusts, should immediately stop the tower crane operations, locking clip rail device, the rotation of the brake system completely loose, the boom can rotate with the wind.
9, In case of six or more windy weather, should stop the pile of mechanical operations, when the wind more than seven should be piling machine downwind, and should increase the cable rope, or pile down on the ground.
10, Wind 6 and above strong winds should be timely after the foundation pit and safety facilities to check.